FACTORS INFLUENCING LEAN MANUFACTURING PRACTICES ON PRODUCTION LEAD TIME SUSTAINABILITY
DOI:
https://doi.org/10.18623/rvd.v23.n2.4167Palabras clave:
Employee Involvement, Just-In-Time, Layout Redesign, Lean Tools, Production Lead-Time, Value-Stream Mapping, SustainabilityResumen
For small and medium-sized enterprises (SMEs) aiming to remain competitive with restricted resources, reducing Production Lead Time (PLT) sustainably counts the most. Tools gleaned from lean manufacturing not only cut waste but also increase efficiency. However, the ability to achieve these aims depends on the context in which they are applied and how well they fit with others. The paper examines how the five main daily work tasks or tools in the lean system, such as Value Stream Mapping (VSM), Just-In-Time (JIT), Setup Time Reduction (STR), Employee Involvement (EI), and Layout Redesign (LR), combine to affect PLT in Malaysian SMEs. While previous studies have clearly highlighted the advantages of each step in a large production setup, the advantages for resource-limited, smaller firms remain largely unknown. This quantitative research, guided by Lean Thinking Theory and Socio-Technical Systems Theory, uses structured questionnaires for production and operations managers. The findings aim to offer insight into how completely integrated lean practices can lead to PLT. It provides practical advice for the adoption of leaner production systems.
Citas
Ahmed, M., Lee, K., & Park, H. (2022). Reducing setup time in flexible manufacturing through SMED and digital integration. International Journal of Production Research, 60(4), 1023–1038. https://doi.org/10.1080/00207543.2022.2021123
Al-Rifai, R. (2024). Lean practices and their effects on order fulfilment performance in electronics manufacturing. Asian Journal of Operations Management, 8(1), 45–59.
Alsulami, A., & Alzahrani, F. (2022). Measuring employee involvement and its effect on lean adoption among Saudi SMEs. Journal of Industrial Engineering Research, 9(2), 55–70.
Bugvi, M., Khan, T., & Iqbal, A. (2021). Integration of lean tools for productivity improvement in manufacturing SMEs. Journal of Lean Systems and Practices, 11(3), 65–78.Dhawan, R. (2023). Just-in-time practices and operational agility in Indian small enterprises. International Journal of Operations & Production Management, 43(2), 156–172. https://doi.org/10.1108/IJOPM-07-2023-0412
Field, A. (2021). Discovering statistics using IBM SPSS statistics (6th ed.). SAGE Publications.
Gebeyehu, D. (2022). Employee involvement and lean success in manufacturing SMEs: Evidence from East Africa. Operations and Strategy Review, 12(1), 24–39.
Ghosh, R., & Das, P. (2024). Measurement of production lead time efficiency in lean environments. Journal of Productivity and Performance, 15(1), 91–108.
Hair, J. F., Hult, G. T. M., Ringle, C. M., & Sarstedt, M. (2019). A primer on partial least squares structural equation modeling (PLS-SEM) (3rd ed.). SAGE Publications.
Joshi, A., Kale, S., Chandel, S., & Pal, D. (2019). Likert scale: Exploring reliability and validity. International Journal of Applied Research and Review, 4(5), 36–42.
Kathem, A., Saeed, A., & Omar, M. (2023). Layout optimization for time efficiency: Evidence from Iraqi leather manufacturing SMEs. Middle East Journal of Industrial Systems, 6(2), 77–88.
Kumar, R., Singh, D., & Pathak, P. (2023). Assessing lean implementation factors in Indian manufacturing SMEs. International Journal of Lean Six Sigma, 14(1), 145–167. https://doi.org/10.1108/IJLSS-01-2023-0021
Lee, J., Park, H., & Kim, S. (2023). Smart SMED: Integrating digital technologies for setup time optimization. Procedia Manufacturing, 57, 1201–1213. https://doi.org/10.1016/j.promfg.2023.04.032
Mrope, N., & Namusonge, G. (2022). The moderating role of organizational culture in employee participation and lean success. African Journal of Business Management, 16(3), 102–117. https://doi.org/10.5897/AJBM2022.9402
Rahman, A., Sulaiman, N., & Omar, H. (2023). Supply chain integration and JIT effectiveness in Malaysian manufacturing SMEs. Asian Journal of Business and Operations, 10(2), 88–99.
Reda, S., & Dvivedi, A. (2022). Value stream mapping as a diagnostic tool for lean transformation in SMEs. Journal of Process Improvement, 8(4), 201–213.
Salman, S., Taqi, H. M. M., Nur, S. M. S. A., Awan, U., & Ali, S. M. (2024). The pathways to lean manufacturing for circular economy: Implications for sustainable development goals. Journal of Responsible Production and Consumption, 1(1). https://doi.org/10.1108/jrpc 10 2023 0009.
Samad, F., Rahman, A., & Malik, R. (2023). Lean tools for reducing production lead time: A study of garment SMEs in Bangladesh. International Journal of Productivity and Performance Management, 72(3), 455–472. https://doi.org/10.1108/IJPPM-03-2023-0125
Setiawan, D., Priyanto, E., & Sutanto, R. (2021). Lean tools and performance improvement in Indonesian manufacturing SMEs. Operations Management Review, 9(4), 301–318.
Sharma, V., Gupta, P., & Joshi, R. (2021). Just-in-time and inventory optimization in lean environments. International Journal of Industrial Operations, 12(2), 132–149.
Singh, A., & Verma, S. (2020). Employee participation and lean implementation in developing economies. International Journal of Human Resource Studies, 10(1), 49–63. https://doi.org/10.5296/ijhrs.v10i1.16384
SME Corporation Malaysia. (2023). SME Corp Malaysia annual report 2023 [PDF]. SME Corporation Malaysia. https://smecorp.gov.my/index.php/my/sme-corp-malaysia-annual-report
Womack, J. P., & Jones, D. T. (2003). Lean thinking: Banish waste and create wealth in your corporation (2nd ed.). Free Press.
Descargas
Publicado
Cómo citar
Número
Sección
Licencia
I (we) submit this article which is original and unpublished, of my (our) own authorship, to the evaluation of the Veredas do Direito Journal, and agree that the related copyrights will become exclusive property of the Journal, being prohibited any partial or total copy in any other part or other printed or online communication vehicle dissociated from the Veredas do Direito Journal, without the necessary and prior authorization that should be requested in writing to Editor in Chief. I (we) also declare that there is no conflict of interest between the articles theme, the author (s) and enterprises, institutions or individuals.
I (we) recognize that the Veredas do Direito Journal is licensed under a CREATIVE COMMONS LICENSE.
Licença Creative Commons Attribution 3.0





